Customer: Andritz
Date: April 2017 – March 2018
Project location: Los Barrios, Cadiz
ANDRITZ – Assembly of line AP5 in Acerinox plant
Mechanical and electrical assembly of new AP5 line in Los Barrios Acerinox plant. It included:
- Design of several pieces (fireplaces)
- Manufacturing of boilermaking and equipment (in our workshops)
- Mechanical assembly in plant
- Electrical assembly in plant
- Paint