skip to Main Content

Customer: GAS NATURAL-FENOSA
Date: 2005 – 2007
Project location: Aceca, Toledo

Assembly of circulation water pipelines and assembly of pipelines and equipment of contracted exterior BOP. Turnkey supply of the regulation and gas measurement installation (ERM).

Back To Top