Customer: KME Spain
Date: March 2017 – July 2017
Project location: Cordoba

Partial demolition and selective excavation in the facilities of the company KME SPAIN situated in Cordoba according to the project GDS-690-2017

The works were firstly based on the demolition of the areas containing concrete floor in order to leave outdoors the contaminated soil to be excavated.

Once the demolition was carried out or in areas in which there was no concrete floor, we carried out selective excavation of materials in preparation for their later load to trucks and management in an authorized dump.

Finally, once the correct decontamination of the zone was guaranteed by the accomplishment of sampling, we proceeded to the landfill of excavations with external pollution-free material.