Customer: Viesgo
Date: February 2016 – October 2016
Project location: Los Barrios (Cadiz)

Mechanical assembly of Reinforcements and isolation of SCR precipitator in Los Barrios Thermal power station, including:

  • Assembly of reinforcements for the support structure
  • Dismantling of the existing isolation and mechanical disassembly of the existing precipitator.
  • Assembly of reinforcements of the support structure for entry and exit ducts to the precipitator, the same ducts and the electrostatic precipitator.
  • Assembly of isolation and metallic sheet of the precipitator and its entry and exit ducts.